Page 153 - Quality Manual_Web_Neat
P. 153
Control of Quality Records
(a) LIST OF QUALITY RECORDS
Sr # Quality Record Rev Location or Retention Period Disposition
No Dept.
100 Concrete slump/temperature, 0 Site Ditto Destroyed
12-09
101 M.E.P works clearance for 0 Site Construction Destroyed
false ceiling,13-01 + defect liability
period
102 M.E.P works clearance for 0 Site Ditto Destroyed
builders works 13-02
103 Site receipt voucher 0 Site Construction Destroyed
weekly report, 14-01 + defect
liability period
104 Wooden doors & Iron mongaries 0 Site Ditto Destroyed
quantities and details status 16-01
105 Tenders table 17-01 1 Est.Dept. One year Destroyed
106 B.O.Q preparation status 17-02 0 Est.Dept. One year Destroyed
107 Quoting sub-contractors. 17-03 0 Est.Dept. One year Destroyed
108 Electrical and fire alarm 0 Est.Dept. 3 years Destroyed
break down, 17-04
109 Price analysis sheet, 17-05 0 Est.Dept. Ditto Destroyed
(Electrical & Fire alarm)
110 Price analysis sheet,17-06 0 Est.Dept. Ditto Destroyed
(Mechanical work)
111 Price analysis sheet,17-07 0 Est.Dept Ditto Destroyed
(fire fighting & fire alarm)
112 Plumbing,Drainage & fire fighting 0 Est.Dept Ditto Destroyed
break down 17-08
113 Price analysis sheet, 17-09 0 Est.Dept 3 years Destroyed
Plumbing, drainage & fire fighting
114 Price analysis sheet, 17-10 0 Est.Dept Ditto Destroyed
Piling works
115 Price analysis sheet, 17-11 0 Est.Dept Ditto Destroyed
Shoring works
116 Price analysis sheet,17-12 0 Est.Dept Ditto Destroyed
Elevators & Escalators
117 Price analysis sheet, 17-13 0 Est.Dept Ditto Destroyed
Aluminum works
118 Price analysis sheet,17-14 0 Est.Dept Ditto Destroyed
Wooden doors
QAP 160 - 01 /6
154
AL HABBAI - QUALITY MANUAL