Page 341 - Fluid Fitting 2018_extended
P. 341
HIGH QUALITY PRODUCTS EXCELLENCE IN SERVICE
ASSEMBLY INSTRUCTIONS
NC CUTTING RING CONT.
Final assembly:
The pre-assembled tube is now mounted into the final assembly-part of the assembling
socket but the frictioning parts should be lubricated in the same way as mentioned at the
pre-assembly. Now hand-tighten the nut and after that fasten the nut appr. 1 1⁄2 turns with a
spanner. Afterwards tighten the nut another 1⁄4 turn.
Note:
The final assembly is indicated by a rapid rise of the torque. Now the fitting is ready for
installation.
Installation into the tube fitting:
The final assembled pipe is after lubrication fed into the taper of the fitting. After hand-tighten
the nut, fasten by 1⁄2 turn until a sudden rise of the torque is indicated.
Re-assembly’s:
After hand-tighten the nut, fasten by 1⁄4 turn until a sudden rise of the torque is indicated.
PH: 0800 FITTINGS 24 HOURS. N51
xii
PH: 0800 FITTINGS 24 HOURS.
Return to Start of Section Return to Main Index

