Page 341 - Fluid Fitting 2018_extended
P. 341

HIGH QUALITY PRODUCTS         EXCELLENCE IN SERVICE




                                        ASSEMBLY INSTRUCTIONS
                                                 NC CUTTING RING CONT.



              Final assembly:
              The  pre-assembled  tube  is  now  mounted  into  the  final  assembly-part  of  the  assembling
              socket but the frictioning parts should be lubricated in the same way as mentioned at the
              pre-assembly. Now hand-tighten the nut and after that fasten the nut appr. 1 1⁄2 turns with a
              spanner. Afterwards tighten the nut another 1⁄4 turn.


















              Note:
              The final assembly is indicated by a rapid rise of the torque. Now the fitting is ready for
              installation.

              Installation into the tube fitting:
              The final assembled pipe is after lubrication fed into the taper of the fitting. After hand-tighten
              the nut, fasten by 1⁄2 turn until a sudden rise of the torque is indicated.


              Re-assembly’s:
              After hand-tighten the nut, fasten by 1⁄4 turn until a sudden rise of the torque is indicated.





































                                                 PH: 0800 FITTINGS 24 HOURS.                                   N51
                                                              xii
                                                 PH: 0800 FITTINGS 24 HOURS.
            Return to Start of Section                                                            Return to Main Index
   336   337   338   339   340   341