Page 60 - Success Model Essays 2022 - PT3
P. 60

English PT3 Part 2 – Theme: Environment
                  •  30% – lack of greenery and public parks – need for landscaping and beautification
                    projects – promised by developer
                  •  14% – waste disposal system – unsatisfactory
                  •  8% - more street lights needed
                  •  Remaining 6% – other issues – speed bumps and indiscriminate parking by residents
                  Conclusion
                  •  Hope for action to be taken to resolve issues

                  Model Answer

                      A survey was recently carried out by the residents of Taman Amansuria. The
                  purpose of the survey was to find out the areas that require improvement within the
                  neighbourhood.
                      The main concern voiced by 42% of the residents is the lack of security in the area.
                  The cases of break-ins and petty thefts have increased drastically since the developer
                  began construction on the second phase of the housing estate. Many residents suspect
                  the construction workers of committing the crimes. Some residents suggested a
                  voluntary night patrol organised by the residents. Others suggested paying a nominal
                  fee to employ security guards to patrol the area.
                      Another major concern among the residents is the lack of greenery and public
                  parks in the area. 30% of residents expressed the need for landscaping and beautification
                  projects to be carried out as promised by the developer. Some of the residents also
                  voiced their dissatisfaction with the inadequate facilities at the children’s playground.
                      14% of the residents highlighted the unsatisfactory waste disposal system in the
                  area. They strongly recommended that the frequency of waste collection be increased
                  to at least three or four times a week from the current twice-weekly collection.
                      8% of the residents highlighted the need for more street lights, especially along
                  the main road leading to the housing estate and the playground area.
                      The remaining 6% mentioned minor issues such as the need for speed bumps on
                  the roads and indiscriminate parking by the residents.
                      The residents hope that the developer and the relevant authorities will take the
                  necessary actions to resolve these issues.



                  WORDBank
                    drastically   –  in a way that has a sudden or serious effect on something
                    patrol      –  make rounds to check on something
                    inadequate   –  not enough
                    indiscriminate  –  done without thought of what the result may be





                                                       255





         PART 02D SUCCES ESSAY PT3 1P.indd   255                                            14/09/2021   3:28 PM
   55   56   57   58   59   60   61   62   63   64   65