Page 88 - JKR HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT 2021 EDITION_Neat
P. 88

SECTION 6.0 – INTERIOR WORKS FURNISHING AND OTHER FITTINGS   SECTION 6.0 – INTERIOR WORKS FURNISHING AND OTHER FITTINGS


 g)  Materials and thickness shall use the following minimum standard steel   c)  All laboratory fittings for gas outlets shall be of the approved suitable
 SECTION 6.0 – INTERIOR WORKS FURNISHING AND OTHER FITTINGS
 thickness for furniture manufacturing:   type following BS 1552. The design shall be robust in construction and
                                     incorporated with a safety drop lever to prevent accidental ‘turn on’ of
 g)  Materials and thickness shall use the following minimum standard steel   the gas tap.
 PARTS
 DETAILS
 thickness for furniture manufacturing:
    Metal   Electro  Galvanized (EG) Steel  to provide  extra   d)  The laboratory waste pipe fittings by mechanical means shall be from
 protection against corrosion.
 DETAILS
 PARTS
 Finishing   Electrostatically  applies  powder  coated  with  a   an approved  manufacturer and in accordance  with BS 4991. The
 Metal   minimum  thickness  of  80  microns,  semi-gloss   mechanical pipe fitting shall be robustly constructed with an injection-
 Electro  Galvanized (EG) Steel  to provide  extra
 finish.                             moulded  component  in  chemical  resistant  black  polypropylene
 protection against corrosion.
 Weight Load   200 kg per maximum leg span of 1.5 meters.
 Finishing
 Electrostatically  applies  powder  coated  with  a
 C-Channel   1.5 mm thick EG Steel with 45 Bevelled Front.   complete with anti-siphonic bottle trap and dilution chamber.
 minimum  thickness  of  80  microns,  semi-gloss
 1.6 mm thick RHS EG Steel
 Leg support   finish.
 1.2 mm thick EG Steel Sheet
 Weight Load
 Cabinet body  200 kg per maximum leg span of 1.5 meters.   e)  Emergency showers shall be chain operated: floor mounted approved
 Double-walled construction with sound dampen
 C-Channel   1.5 mm thick EG Steel with 45 Bevelled Front. ing   type of system fixed at an approved  kind of system  set at an
 Cabinet front
 Leg support   material in between.   appropriate  overhead  height  not  less  than  2000  mm.  The  area
 door/drawer
 1.6 mm thick RHS EG Steel
 Drawer rail
 Cabinet body   Powder-coated railing with soft close mechanism   demarcated shall be laid to fall to stainless steel gratings.
 1.2 mm thick EG Steel Sheet
 Cabinet front   and load bearing of 20 kg.
 Double-walled construction with sound dampening
 Door hinges   material in between.   f)  All laboratory service fixtures shall be the product of one service fixture
 110° wide opening with 2 parts detachable hinges
 door/drawer
 Powder-coated railing with soft close mechanism
 Drawer rail   and soft-close mechanism.
 Glass viewing   6 mm thick tempered glass   manufacturer to assure uniform appearance and ease of maintenance
 and load bearing of 20 kg.
 window   110° wide opening with 2 parts detachable hinges   of the laboratory facility.
 Door hinges
 Castor   and soft-close mechanism.
 Polyurethane medical-grade dual-wheel castor
 Glass viewing   with gear lock.   g)  All laboratory service fittings shall be made of solid brass pressings
 6 mm thick tempered glass
    window                           alongside the high-quality brass tube.
    Castor   Polyurethane medical-grade dual-wheel castor
 with gear lock.
 h)  The door hinges and drawer rail must come with a lifetime warranty from   h)  Undergo  state  of  the  art  hydrostatic  testing  at  10  bar  (145  psi)  to
    the specialist supplier.
                                     ensure product quality and leakage-free operation.
 h)  The door hinges and drawer rail must come with a lifetime warranty from
 i)  Service dropper shall be inclusive of 3 compartments to separate the
 the specialist supplier.         i)  Epoxy powder coated finishing.
 wet and dry M&E services.

 i)  Service dropper shall be inclusive of 3 compartments to separate the   j)  All fixtures are  tested to BS EN 5412:1996, which includes water
 j)  Reagent rack shall be slot-in type with a fully adjustable height for each
 wet and dry M&E services.           tightness and pressure resistance.
 shelf. Each shelf should be able to withstand a load of 60 kg.

 j)  Reagent rack shall be slot-in type with a fully adjustable height for each
 k)  3 compartments  cable management trunking system shall be
 shelf. Each shelf should be able to withstand a load of 60 kg.   6.2.4.5     Laboratory Loose Furniture
 incorporated with the reagent rack and affix of 300 mm from the worktop
    surface.
 k)  3 compartments  cable management trunking system shall be   a)  Provision for laboratory loose furniture shall not be part of the contract.

 incorporated with the reagent rack and affix of 300 mm from the worktop
 6.2.4.4   Laboratory Fittings and Accessories   The procurement of laboratory loose furniture shall follow the current
    surface.                          rules, policies, and procedures of Pekeliling Perbendaharaan (PP).

 a)  The laboratory furniture shall come complete with approved proprietary
 6.2.4.4   Laboratory Fittings and Accessories   b)  All fit-outs and laboratory loose furniture shall be as design proposal
 accessories  and fittings necessary for the laboratories’  proper
    functioning.                      and indicative only. Contractor shall indicate it in the Loaded Plans.
 a)  The laboratory furniture shall come complete with approved proprietary

 accessories  and fittings necessary for the laboratories’  proper
 b)  All  laboratories  shall  be  provided  with  a  cold and  hot  water  outlet,   c)  A detail schedule of laboratory loose furniture shall be drawn up as and
 functioning.                         submitted as indicative proposal as shown in Appendix 8 – Schedule
 complete with swivel neck nozzles and elbow action lever supplied by
   an approved local manufacturer.    of Loose Furniture.
 b)  All  laboratories  shall  be  provided  with  a  cold and  hot  water  outlet,
 complete with swivel neck nozzles and elbow action lever supplied by
 an approved local manufacturer.    78
 2021 EDITION                                          HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT

 78                                                                                                     79
 2021 EDITION                                          HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT   2021 EDITION                                          HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT
   83   84   85   86   87   88   89   90   91   92   93