SECTION 6.0 – INTERIOR WORKS FURNISHING AND OTHER FITTINGS SECTION 6.0 – INTERIOR WORKS FURNISHING AND OTHER FITTINGS
free and weather proof material, and the size of the signage shall be not
6.4.4 Blackout curtains shall be provided to specified areas such as the less than 2100 mm (height) x 1200 mm (width).
audiovisual room, dark room, or meeting room to the PD’s concurrence.
6.6.4 All road signage shall be well-coordinated and following the latest Arahan
6.4.5 Motorised stage curtains shall be provided in a multi-purpose hall and Teknik Jalan (ATJ) by Cawangan Jalan, JKR.
auditorium with a stage complete with M&E, structural and maintenance 6.6.5 The design and selection of internal and external signage shall be well-
requirements. coordinated with the PD’s concurrence.
6.6.6 Signage and directories for the main lobby/ lobbies of a new building and
6.5 SPECIAL FITTINGS AND ACCESSORIES renovated existing building shall be well-coordinated with the overall
concept and place at the visitors’ eye-level. It shall be designed with high
6.5.1 The selected material for fittings and accessories shall suit the required contrast for the visually impaired.
location and position. The successful tenderer shall submit specifications
and samples of the fittings and accessories before fixing and to the PD’s 6.6.7 The language used on the signage shall be of the Client’s requirements.
concurrence. The Client shall provide detailed information on the buildings and the
department’s designation.
6.5.2 The fittings and accessories work shall consider all architectural finishes
and M&E requirements. 6.6.8 All fire and M&E signs shall be minimum of 4 mm clear acrylic and spray-
painted with silkscreen finish or sticker cut-out. The signages’ size shall be
6.5.3 A detailed schedule of other accessories shall be drawn up and submitted not less than 58 mm (height) x 250 mm (width) and shall comply with the
as part of the proposal. JBPM’s requirements. All illuminated signs shall be of translucent graphic
films and shall also comply with the JBPM’s requirements.
6.6 SIGNAGES AND DIRECTORIES 6.6.9 All signage and directories shall be provided as required in the proposed
scope of works under as follows:
6.6.1 The successful tenderer shall submit a detailed schedule of internal and
external signages shall be drawn up and submitted as part of the proposal, a) Projects main signboard and logo (details are to be provided by the
as shown in Appendix 9 - Schedule of Internal and External Signages. Client).
a) The code and format for labelling of components shall be as stipulated
in the Government’s: b) External directional signs to be located at external corridors, parking,
walkways and roads, buildings, sectional/blocks, and room names,
i. Asset Code System (Sistem Kod Aset Tak Alih – SKATA), and; signs, or titles.
ii. Asset Data Collection Guidelines (Garis Panduan Pengumpulan
Data Aset Tak Alih – PeDATA). c) Internal directional signs to be located at departmental, internal
corridors, lobbies, room names (designations and name-plates), signs
b) All labels for the asset components’ registration shall comply with the to be provided as stated in the room list or SOA.
regulatory requirements currently enforced and shall comply with the
relevant international and/or Malaysia Standards. d) Escape routes and stairways as required by the JBPM.
6.6.2 The material for signages and directories shall suit the required function, e) Toilets, utility, and services rooms (e.g., rooms for M&E installation,
location, and availability of the local market’s material. The successful stores, cleaners, etc.)
contractor shall submit the specifications and samples of the signage to the
PD’s concurrence. 6.6.10 All general signages (e.g., toilet signs, ablution, etc.) shall be a minimum of
6.6.3 All external buildings’ signage and directories shall be of 3 mm thick 4 mm clear acrylic and spray-painted with silkscreen finish or sticker cut-
aluminium panel fabricate for the body and graphic panel spray-painted out. The suitable sizes of the signage shall be proposed by the tenderer
with silkscreen finish or sticker cut-out. The signage shall be of corrosion- and to the PD’s concurrence.
82 83
2021 EDITION HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT 2021 EDITION HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT