Page 122 - Approved Annual Budget FY 2019-2020_Flat
P. 122

General Fund
          The image part with relationship ID rId1 was not found in the file.
                                                                                            Engineering

                                                                                     www.mcallen.net/engineering
              Mission       Department Summary
           Statement:                                         Actual      Adj. Budget    Estimated     Budget
            The Engineering   Expenditure Detail:             17-18        18-19         18-19        19-20
          Department designs,   Personnel Services
          manages and guides     Salaries and Wages       $         1,162,225  $         1,475,875  $         1,475,875  $         1,514,125
           the construction of     Employee Benefits              336,671      359,908      359,908       391,816
          public infrastructure   Supplies                          12,363       13,000        13,000      13,000
          and buildings while   Other Services and Charges          97,989     137,327      128,639        141,589
          ensuring quality and   Maintenance                        44,376       34,610       45,610        37,110
          safety to all who visit,
            live and conduct   Operations Subtotal               1,653,624       2,020,720       2,023,032       2,097,640
          business within the     Capital Outlay                      2,117       33,702       28,100       30,000
          boundary of our City.
                             Total Expenditures           $       1,655,741  $       2,054,422  $       2,051,132  $       2,127,640
                             PERSONNEL
                             Exempt                                    10           11            11           11
                             Non-Exempt                                14           16            15           17
                             Part-Time                                    -        -                -             -
                             Total Positions Authorized             24           27            26           28
           Contact Us:                                 MAJOR FY 19-20 GOALS

           Yvette Barrera, PE      1.) Design and erect new monument sigs/landscaped areas at key McAllen entry points. (1.3.2 ; 3.2.2
             City Engineer       2.) Construct Monarch Butterfly Habitat project. (1.4.3)
             311 N. 15th
           McAllen, TX 78501       3.) Construct sidewalks at various locations within the City. (1.5.9)
            (956) 681-1150  4.) Complete Expressway 83 & Bicentennial interchange openning major North/South arterial. (2.1.4)
                            5.) Adopt a Storm Water Management Ordinance to reduce water pollution. (4.4.2)
                            6.) Complete construction of an addional Police Headquaters facility including a new parking garage. (
                            7.) Complete various street improvement projects approved from the 2015 bond. (6.2.2)
                            8.) Construct Bicentennial Extension - Trenton to 107. (6.2.3)
                            9.) Upgrade Ware Road Expension alongside TxDOT. (6.2.4)
                            10.) Continue roadway improvements at key intersections, Taylor & mile 3; Bicentenial & Trenton. (6.
                            11.) Widen Daffodil ave from Ware Rd to Taylor Rd, including curb and gutter section. (6.2.8)
                            12.) Upgrade Mile 5, Ware Road to Taylor Road. (6.2.10)
                            13.) Construct projects approved from 2018 Drainage Bond. (6.3.1)
                            14.) Improve drainage in various City locations with funds from Drainage Fees. (6.3.2)
                            15.) Complete Westway Heights and Kennedy Avenue Drainage projects. (6.3.4 ; 6.3.5)
                            16.) Reprofile main drain ditches. (6.3.8)
                            17.) Assess and mitigate bank and storm sewer outfall erosion. (6.3.11)
                            18.) Establish baseline stormwater quality (WQ) parameters. (6.3.12)
                            19.) Adopt Stormwater Management Ordinance. (6.3.16)
                            20.) Seek grant oppurtunities for paving and drainage improvements.
























                                                          - 73 -
   117   118   119   120   121   122   123   124   125   126   127