Page 98 - JKR HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT 2021 EDITION_Neat
P. 98
SECTION 6.0 – INTERIOR WORKS FURNISHING AND OTHER FITTINGS SECTION 7.0 – LANDSCAPE AND TURFING
6.6.24 Contents for the Client’s Charter display cabinet shall be furnished by the SECTION 7.0: LANDSCAPE AND TURFING
Client.
6.6.25 Separate cabinets shall be provided for the Client’s Charter and Workflow 7.1 SCOPE OF WORKS
Chart.
7.1.1 All landscaping and turfing works shall comply with the JKR Standard
6.6.26 The Mission and Vision Board shall be coordinated with the interior design
concept. Specifications for Building Works.
6.6.27 Materials used for various signages inside the hospital shall complement 7.1.2 The landscape works for the whole project shall comprise both soft and
the building’s interior design concept. The successful tenderer shall submit hard landscaping, including therapy and therapeutic garden in accordance
specifications and samples of signages for the PD’s concurrence. with requirements of the local authority and approval of the government.
6.6.28 The successful tenderer shall propose various colour schemes and 7.1.3 Softscape shall comprise of, but not limited to groundcovers, climbers,
graphics for the PD’s concurrence and the Client. creepers, shrubs, trees, palms, and turf.
7.1.4 Hardscape shall include, but not limited to outdoor benches and tables, litter
bins, planter boxes, garden lights, art sculptures, boulders, pebbles and
gravels, water features and gazebo (wakaf).
7.1.5 All landscape work shall cover the whole project complex, including open
parking areas and roadsides. All open parking shall be planted with shade
trees, and palm trees are not allowed in the car park.
7.1.6 The successful tenderer is encouraged to plants shaded trees within
building parameters to reduce heat transfer to the building. However, the
minimum distance between the perimeter drain to the tree trunk must be
according to the guideline set by the Local Authority or Jabatan Lanskap
Negara (JLN).
7.1.7 Tree planting on pavement area or footpath shall include root barrier for
protection from damage as indicated in the JKR Standard Specifications for
Building Works.
7.1.8 Appropriate landscape design concepts shall be introduced in areas
between building blocks and courtyards. Spaces between buildings shall
be landscaped or shaded to function as multi-purpose outdoor areas and
minimize heat absorption through the building envelope.
7.1.9 Landscape works shall commence twelve (12) months before the project
completion date or as agreed to by the PD so that the trees and plants are
well grown and have fully adapted to the environment when the project is
handed over upon completion.
7.1.10 The successful tenderer shall set up a temporary nursery within the site to
cultivate/grow the said project's plants.
88 89
2021 EDITION HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT 2021 EDITION HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT

