Page 97 - JKR HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT 2021 EDITION_Neat
P. 97

SECTION 6.0 – INTERIOR WORKS FURNISHING AND OTHER FITTINGS                                                                                     SECTION 7.0 – LANDSCAPE AND TURFING



                        6.6.24    Contents for the Client’s Charter display cabinet shall be furnished by the                                  SECTION 7.0: LANDSCAPE AND TURFING
                                  Client.

                        6.6.25    Separate cabinets shall be provided for the Client’s Charter and Workflow                                    7.1       SCOPE OF WORKS
                                  Chart.

                                                                                                                                               7.1.1     All landscaping and turfing works shall comply  with  the  JKR Standard
                        6.6.26    The Mission and Vision Board shall be coordinated with the interior design
                                  concept.                                                                                                               Specifications for Building Works.

                        6.6.27    Materials used for various signages inside the hospital shall complement                                     7.1.2     The landscape works for the whole project shall comprise both soft and
                                  the building’s interior design concept. The successful tenderer shall submit                                           hard landscaping, including therapy and therapeutic garden in accordance
                                  specifications and samples of signages for the PD’s concurrence.                                                       with requirements of the local authority and approval of the government.

                        6.6.28    The successful  tenderer shall propose  various colour schemes and                                           7.1.3     Softscape shall  comprise of, but  not limited  to groundcovers,  climbers,
                                  graphics for the PD’s concurrence and the Client.                                                                      creepers, shrubs, trees, palms, and turf.


                                                                                                                                               7.1.4     Hardscape shall include, but not limited to outdoor benches and tables, litter
                                                                                                                                                         bins, planter boxes, garden lights, art sculptures, boulders, pebbles and
                                                                                                                                                         gravels, water features and gazebo (wakaf).

                                                                                                                                               7.1.5     All landscape work shall cover the whole project complex, including open
                                                                                                                                                         parking areas and roadsides. All open parking shall be planted with shade
                                                                                                                                                         trees, and palm trees are not allowed in the car park.

                                                                                                                                               7.1.6     The successful tenderer is encouraged  to plants shaded trees  within
                                                                                                                                                         building parameters to reduce heat transfer to the building. However, the
                                                                                                                                                         minimum distance between the perimeter drain to the tree trunk must be
                                                                                                                                                         according to the guideline set by the Local Authority or Jabatan Lanskap
                                                                                                                                                         Negara (JLN).

                                                                                                                                               7.1.7     Tree planting on pavement area or footpath shall include root barrier for
                                                                                                                                                         protection from damage as indicated in the JKR Standard Specifications for
                                                                                                                                                         Building Works.

                                                                                                                                               7.1.8     Appropriate  landscape  design  concepts  shall  be  introduced  in  areas
                                                                                                                                                         between building blocks and courtyards. Spaces between buildings shall
                                                                                                                                                         be landscaped or shaded to function as multi-purpose outdoor areas and
                                                                                                                                                         minimize heat absorption through the building envelope.

                                                                                                                                               7.1.9     Landscape works shall commence twelve (12) months before the project
                                                                                                                                                         completion date or as agreed to by the PD so that the trees and plants are
                                                                                                                                                         well grown and have fully adapted to the environment when the project is
                                                                                                                                                         handed over upon completion.

                                                                                                                                               7.1.10    The successful tenderer shall set up a temporary nursery within the site to
                                                                                                                                                         cultivate/grow the said project's plants.



                                                                                                        88                                                                                                                     89
                        2021 EDITION                                          HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT                    2021 EDITION                                          HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT
   92   93   94   95   96   97   98   99   100   101   102