24 Applied Process Design for Chemical and Petrochemical Plants
PIPE LINE LIST
..
'LUOR CORP'OltATION 0 LT.II·
=.:- , Cll-.-=_:_:_:_:_:_:_:_:_:_:_:_:_:_:_:_:_:_:_:_:_:_:_:_:_::= :�; .. ��·-;;:--or __ ,.,v.
LOCATIOH OAT[
rLo• I uUCRIPTION ,.SIG .,
lltV. SH. LIPU: " s CCMKIOITV BRIC.IN TJRMINU� ""'· S(RI/,
... ... �ASS SIU t F'll'OM TO OP[R: OPE.I,
6
6
6
6
6
!:::.
16
!:::.
16
6
6
6
6
6
6
6 16 16 ID. 16 16 16 ID.
Figure 1-248. Pipe line List. By permission: Fluor Corp, Ltd.
Line Schedule Sheet
Quantity Quantity Sp. Gr. Ea pan- Pre 11. Est. Line
Line Flow Temp., Preas. DenallJ Denelty, Sp.Gr. At Flow 1ion Chemical Mal. Line Drcp/ Line Line LiM
Prass.
Number Medium Flow,Gpm. Flow, "F. pal. Lb./Fl Lb.lGol. At 60F. Tttnp. Coeff. Formula Wt. Size 100 Ft. Len;th Drop Orl9ln Termination
or Scfll. Lb.I Hr.
- --- - - � / /
"' �
Figure 1-24C. Line schedule sheet (alternate). By permission, J.P. O'Donnell, Chemical Engineer, September 1957.
Line Summary Tobie
Title: Job No. Shut No.
Op"'
No. Moteriol Fram To Line Temp. Oper. Tut Ouanitv G.P.M. C.F.S. Vol. Prus. Droo R,marh No.
Size Press. Preas. ft/HR. G.P.M.60@ F.P.S. Per 100' Totot
•f (Hot) !Hot)
- - - - - - -
Figure 1-240. Line summary table.