Page 342 - ANUAL REPORT MOH 2017
P. 342
Figure 7
CPA Jan-Jun 2017
Source: Engineering Services Division, MoH
• OTHER ACTIVITIES
The Installation of Off-grid Photovoltaic (PV) Solar System at Klinik Kesihatan Pensiangan, Sabah has
been completed on 9 of Mac 2017. Solar-powered photovoltaic (PV) panels convert the sun’s rays
into electricity and produced 25kWh of solar energy per day for the clinic and quarters usage. Now the
project is under Defect Liability Period and there is maintenance of work that need to be done by the
Contractor until 9 Mac 2019.
Image 13
Installation of Off-Grid Photovoltaic Solar System at Pensiangan Health Clinic, Keningau, Sabah
Source: Engineering Services Division, MoH
National Blue Ocean Strategy (NBOS) for quarters repair has also made a huge impact on the services
to society. The effort of collaboration on NBOS with other external agency and as well as the NBOS
programme under the MoH itself have successfully resulted in cost saving in repairing the quarters.
Allocation of RM514,819.50 for quarters repairing works under NBOS Programme 2017 with other
agency have resulted in cost saving of more than 45 per cent in comparison to normal procurement.
MINISTRY OF HEALTH MALAYSIA ANNUAL REPORT 2017 341