when Guide took time off after his father’s death.   189   Those responsibilities
                   included investigation of the March 8 kick incident.

                          On April 6, Keith Daigle, BP well operations advisor, notified Guide that
                   Bob Kaluza would replace Ronnie Sepulvado as one of the two BP well team
                   leaders on the Deepwater Horizon so that Sepulvado could attend well control
                            190
                   training.   Kaluza had four years of deepwater drilling experience but minimal
                   experience with the Deepwater Horizon rig.

                          Meanwhile, the problem of “just in time delivery of well plans,” which
                   O’Bryan expressed concerns about, continued.  In a post‐blowout interview,
                   Gregg Walz stated that, at the time, he “was concerned about last minute
                   changes and he wanted to get work done earlier.”   On April 12, Sepulvado
                                                                        191
                   emailed Brian Morel to ask for temporary abandonment procedures.   Morel’s
                                                                                            192
                   subsequent emails revealed that he still had not completed the temporary
                   abandonment procedures and was still not sure whether the Macondo drilling
                   team would set the lock‐down sleeve during temporary abandonment.
                                                                                              193

                          There was evidence that members of the Macondo team were concerned
                   about operations at Macondo.  Morel emailed his wife on April 14 that he had to
                   go offshore to the Deepwater Horizon rig because “our normal WSL [well site
                   leader] is heading in and the new guy is good, but not in tune with the well so I
                   need to go out and make sure they follow every step as any deviations could
                   lead to us not getting a good cement job and having to do a lot of remedial
                   operations.”
                                194

                          In the days immediately prior to the blowout, the contentious emails
                   between Guide and Sims continued.  On April 15, Sims emailed Guide to see if
                   he could meet with him the following morning, and Guide responded by asking
                   Sims if he was going to be fired.  In the same email, Sims asked whether he
                   needed to “delegate” Guide’s work since Guide had been out of the office and
                                                       195
                   Sims did not know where he was.   At this time, the Macondo team was
                   working on critical cementing procedures and needed input from Guide.


                   189  BP‐HZN‐MBI00214540.
                   190  BP‐HZN‐MBI00241455.
                   191  BP‐HZN‐BLY00061325.
                   192  BP‐HZN‐MBI00199122.
                   193  BP‐HZN‐MBI00126145; BP‐HZN‐MBI00126333.
                   194  BP‐HZN‐MBI00329028.
                   195  BP‐HZN‐MBI002543828; BP‐HZN‐MBI00254858.